Manor Build has once again proven its expertise in delivering superior prefabricated buildings, this time delivering transportable holiday park accommodation for Cambridge Top 10 Holiday Park. The project necessitated the design and construction of four new 2-bedroom accommodation units for completion prior to the summer rush.


For their fifth project with Manor Build, Cambridge Top 10 aimed to expand their holiday park accommodations with high-quality, durable, and visually appealing units. Their specific goals included:





Manor Build not only met but exceeded expectations by delivering all four prefab holiday park accommodation units within 5 months from the contract being signed. The buildings were manufactured in our New Plymouth factory and completely finished off inside including plywood linings, commercial grade materials and fixtures, and specific attention to detail. Once delivered and installed on piled foundations we also built the decks and verandas to finish off the project.
Build time from contract to delivery – 5 months.
Fill out our form to get an estimate of price emailed to you or get in touch and we can talk you through the various options.