Building your home with Manor Build

Manor Build is not your average New Zealand building company. We design and build high-quality, full-size transportable homes and commercial buildings designed with lifestyle practicalities and durability in mind.

Modern kitchen with white cabinetry, a white island with a sink and plant, wooden floors, and a small dining table with black chairs and a vase of flowers.

Quality homes and offices built for durability

Our builds aren’t cheap and cheerful, or built to act as temporary spaces. They are thoughtfully designed, sustainably built homes and offices that provide energy efficiency and guarantee durability. From our New Plymouth based factory, we deliver dream family homes, downsizer homes, granny flats, holiday park accommodation units, farm staff accommodation and prefab offices throughout the North Island. 

Our process: Plan, Build, Deliver

Building a transportable home takes a disciplined process so you get your home on time and on budget, without the stress. We work in three clear stages.

1.
Plan
Your site and your home, sorted
2.
Build
Made in our New Plymouth factory
3.
Deliver
Installed, signed off, keys in hand

Plan

The Plan stage takes from a few weeks to a few months. We sort out every detail of your site and your home so that when you sign the build contract the price is fixed and everything is ready to go. Straight away we get a PIM from your council (usually 2 to 4 weeks), which shows any overlays and planning rules on your site, and a geotech report (around 2 weeks), which tells us what your foundations need and how septic or stormwater will work. At the same time you choose your layout changes, colours, finishes and specifications, and we price any site services in scope. The Plan stage has its own fee, which is relatively low; we'll give you the fee for your site.

Build

Once you sign the build contract we order the first materials and lodge your building consent if one is needed. Our consents now go through BCAL, an independent consent authority, and usually come back within 1 to 2 weeks. We start on the floor while the roof trusses arrive, so consent doesn't hold up the build.

The factory build takes about 10 to 12 weeks, and you're welcome to visit and see your home coming together.

Building consent: usually 1 to 2 weeks
Factory build: 10 to 12 weeks
Build contract to delivery: about 4 months

Visit our New Plymouth purpose built factory

3000 m2 weatherproof factory space with capacity for 70 transportable homes every year

Book a visit

Deliver

We deliver your home and install it on its pile foundations, complete the site works in your contract, and request the final sign-off (the Code Compliance Certificate for a consented home). In Taranaki we can take on the site works as well, as a turnkey job, when that suits your project. Many clients use their own trades for connections and decks, and outside Taranaki your local trades do this work using the specifications and information we provide.

Within about 4 weeks of delivery our team comes back for a final detail inspection, fixing any small transport marks and finishing touch-ups, and we walk through the home with you. If there are no site works in your contract, we hand you the keys on delivery. If there are, we hand them over when the site works are finished, usually a few weeks later depending on the work.

View designs and pricing
Modern single-story dark gray house with a yellow door overlooking the ocean and surrounded by green shrubbery and grass.Bright modern open-plan kitchen and living area with white dining table, black chairs, gray sofas with yellow cushions, and sliding glass doors.Large modern house elevated on hydraulic lifts attached to a truck, set on grassy land near the ocean at sunset.

Frequently asked quesitons

All FAQ's
How much does it cost to build a passive house in New Zealand?
In New Zealand, building a certified Passive House typically costs about 10 % more than a standard home due to the cost of higher-performance materials and tighter construction tolerances.
What is the downside of modular homes?
A downside of modular homes could be that design flexibility can be limited compared to fully custom on-site builds, as modules must conform to transport and size restrictions. Additionally, transport and site access challenges can add cost or complexity for remote or difficult-to-reach locations.
What is included in the price?
The home price is for the complete, finished house leaving our factory, including painting, flooring, kitchen and bathroom, and the building consent for the home. Freight, foundations, service connections and other site work depend on your site and are priced during our Plan stage. We coordinate the site (relocate) consent for you, but its council fees are paid by you directly, as are any council development contributions. Landscaping, driveways and fencing aren't included.
What site preparation is required?
It does depend on the contour of the land, but normally a Manor Build home only requires a vegetation-free area.
Modern open-plan living area with a white kitchen island, dining table with green apples centerpiece, and seating area with sofa and armchairs near large sliding glass doors.Industrial warehouse with green corrugated walls labeled SHED 08 near a waterfront with ships and small buildings with grey roofs in the foreground.

Contact us today

If you’d like to visit our New Plymouth showhome, have a factory tour and chat more about your home build project, get in touch.

Contact us